PRESSURE VESSELS

 

2&nbspJCP SCOPE OF SUPPLY

Delivery of pressure equipment and vessels to PED 97/23/EC including 3rd party design appraisal, inspections and certification.

 

Client: Europa Crown Ltd

Project type: BTP

Location: Various

2&nbspJCP total weight: approx 850 tons, stainless steel 316L

Finished in: 2016

 


 

Cameron LNG

 

This project is addition of natural gas liquefaction and export facilities to the existing LNG regasification facility in Hackberry, Louisiana.

 

2 JCP SCOPE OF SUPPLY

Supply of 6 sets filter houses for 7EA gas turbines which drive three compressor trains. Filter houses were equipped with high pressure anti icing system piping.

 

Client: Clarcor Industrial Air

Project type: BTP

Location: Hackberry, Louisiana, USA

2 JCP total weight: approx 850 tons stainless steel 316L

Finished in: February , 2016